TPS3851EVM-780

Mfr. #: TPS3851EVM-780
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools Evaluation Module
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS3851EVM-780 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS3851EVM-780 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Supervisory Circuits type. 1.6 V to 6.5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS3851EVM-780 Image

TPS3851EVM-780

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS3851EVM-780 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Supervisory Circuits
  • Tool Is For Evaluation Of: TPS3851
  • Input Voltage: 1.6 V to 6.5 V
  • Description/Function: Evaluation module for TPS3851 voltage supervisor
  • Series: TPS3851
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS3851EVM-780

TPS3851EVM-780 Specifications

TPS3851EVM-780 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Supervisory Circuits.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 1.6 V to 6.5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top