TPS2HA08AQ1EVM

Mfr. #: TPS2HA08AQ1EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS2HA08AQ1EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2HA08AQ1EVM Overview

This product is manufactured by Texas Instruments. The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko.

TPS2HA08AQ1EVM Image

TPS2HA08AQ1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2HA08AQ1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • Qualification: AEC-Q100
  • Series: TPS2H160
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER

TPS2HA08AQ1EVM

TPS2HA08AQ1EVM Specifications

TPS2HA08AQ1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Qualification of the product?

    Q: The Qualification of the product is AEC-Q100.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is SIMPLE SWITCHER.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top