| Mfr. #: | TPS2H160EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Power Management IC Development Tools TPS2H160EVM |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TPS2H160EVM डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 3.4 V to 40 V Input Voltage Output Voltage is 40 V Output current: 2.5 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2H160EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Power Distributions.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 3.4 V to 40 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 40 V
A: What is the Output Current of the product?
Q: The Output Current of the product is 2.5 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 150 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: At what frequency does the Tradename?
Q: The product Tradename is SIMPLE SWITCHER.