TPS2420EVM-01

Mfr. #: TPS2420EVM-01
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools TPS2420 Hot Swap Controller Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS2420EVM-01 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2420EVM-01 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Hot Swap Voltage Controllers type. 3 V to 18 V Input Voltage Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2420EVM-01 Image

TPS2420EVM-01

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2420EVM-01 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS2420
  • Input Voltage: 3 V to 18 V
  • Series: TPS2420
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2420EVM-01

TPS2420EVM-01 Specifications

TPS2420EVM-01 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Hot Swap Voltage Controllers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3 V to 18 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top