TPS23754EVM-383

Mfr. #: TPS23754EVM-383
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools TPS23754 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS23754EVM-383 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS23754EVM-383 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Hot Swap Voltage Controllers type. 0 V to 57 V Input Voltage Output Voltage is 12 V Texas Instruments is a trusted brand for quality electronics Interface Type: Ethernet Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.270215 oz of Unit Weight

TPS23754EVM-383 Image

TPS23754EVM-383

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS23754EVM-383 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS23754
  • Input Voltage: 0 V to 57 V
  • Output Voltage: 12 V
  • Series: TPS23754
  • Brand: Texas Instruments
  • Interface Type: Ethernet
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.270215 oz

TPS23754EVM-383

TPS23754EVM-383 Specifications

TPS23754EVM-383 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Hot Swap Voltage Controllers

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 0 V to 57 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 12 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Ethernet.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.270215 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top