TPS22976EVM

Mfr. #: TPS22976EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools EVALUATION MODULE FOR THE TPS22976
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS22976EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22976EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 600 mV to 5.7 V Input Voltage Output current: 6 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS22976EVM Image

TPS22976EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22976EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: TPS22976
  • Input Voltage: 600 mV to 5.7 V
  • Description/Function: Evaluation module for TPS22976 load switch
  • Output Current: 6 A
  • Series: TPS22976
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS22976EVM

TPS22976EVM Specifications

TPS22976EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Distributions

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 600 mV to 5.7 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 6 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top