TPS22975EVM

Mfr. #: TPS22975EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools EVALUATION MODULE FOR THE TPS22975
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS22975EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22975EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 0.6 V to 5.7 V Input Voltage Output Voltage is - Texas Instruments is a trusted brand for quality electronics Compatible with TPS22975. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS22975EVM Image

TPS22975EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22975EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22975
  • Input Voltage: 0.6 V to 5.7 V
  • Output Voltage: -
  • Description/Function: Load switch evaluation module
  • Series: TPS22975
  • Brand: Texas Instruments
  • For Use With: TPS22975
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS22975EVM

TPS22975EVM Specifications

TPS22975EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Load Switches

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 0.6 V to 5.7 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is -.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS22975

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top