TPS22810EVM

Mfr. #: TPS22810EVM
निर्माता: Texas Instruments
विवरण: Switch IC Development Tools TPS22810EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPS22810EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22810EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Switch IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS22810EVM Image

TPS22810EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22810EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Switch IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TPS22810
  • Description/Function: Evaluation module for TPS22810 load switch
  • Series: TPS22810
  • Brand: Texas Instruments
  • Product Type: Switch IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS22810EVM

TPS22810EVM Specifications

TPS22810EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Switch IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top