TPA3129D2EVM

Mfr. #: TPA3129D2EVM
निर्माता: Texas Instruments
विवरण: Audio IC Development Tools TPA3129D2EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPA3129D2EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3129D2EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 4.5 V to 26 V operating supply voltage range Output power: 2 x 15 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.221484 oz of Unit Weight

TPA3129D2EVM Image

TPA3129D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3129D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3192D2
  • Operating Supply Voltage: 4.5 V to 26 V
  • Output Power: 2 x 15 W
  • Series: TPA3129D2
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.221484 oz

TPA3129D2EVM

TPA3129D2EVM Specifications

TPA3129D2EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 4.5 V to 26 V.

  • A: Is the cutoff frequency of the product Output Power?

    Q: Yes, the product's Output Power is indeed 2 x 15 W

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.221484 oz.

19 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top