TPA2008D2EVM

Mfr. #: TPA2008D2EVM
निर्माता: Texas Instruments
विवरण: Audio IC Development Tools TPA2008D2 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TPA2008D2EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2008D2EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 5 V to 15 V operating supply voltage range Output power: 3 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA2008D2EVM Image

TPA2008D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2008D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA2008D2
  • Operating Supply Voltage: 5 V to 15 V
  • Output Power: 3 W
  • Series: TPA2008D2
  • Brand: Texas Instruments
  • Operating Supply Current: 7 mA
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA2008D2EVM

TPA2008D2EVM Specifications

TPA2008D2EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V to 15 V

  • A: Is the cutoff frequency of the product Output Power?

    Q: Yes, the product's Output Power is indeed 3 W

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top