| Mfr. #: | TL1963A-33EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Power Management IC Development Tools TL1963A-33EVM |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | TL1963A-33EVM डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the LDO Voltage Regulators type. 20 V Input Voltage Dimensions of 63.5 mm x 63.5 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TL1963A-33EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is LDO Voltage Regulators.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 20 V
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 63.5 mm x 63.5 mm.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.