TAS2560EVM

Mfr. #: TAS2560EVM
निर्माता: Texas Instruments
विवरण: Audio IC Development Tools TAS2560EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: TAS2560EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS2560EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with TAS2560. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.204141 oz of Unit Weight

TAS2560EVM Image

TAS2560EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS2560EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS2560
  • Series: TAS2560
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: TAS2560
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.204141 oz

TAS2560EVM

TAS2560EVM Specifications

TAS2560EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TAS2560.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.204141 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top