SN65LVDS387EVM

Mfr. #: SN65LVDS387EVM
निर्माता: Texas Instruments
विवरण: Other Development Tools 16-Ch LVDS Driver Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: SN65LVDS387EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
SN65LVDS387EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LVDS Driver/Receiver type. Texas Instruments is a trusted brand for quality electronics Interface Type: LVDS 2 V to 4 V operating supply voltage range Other Development Tools product type 1 of 100 Development Tools as subcategory

SN65LVDS387EVM Image

SN65LVDS387EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

SN65LVDS387EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Other Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LVDS Driver/Receiver
  • Tool Is For Evaluation Of: SN65LVDS386, SN65LVDS387
  • Description/Function: 16-Channel LVDS Driver
  • Series: SN65LVDS387
  • Brand: Texas Instruments
  • Interface Type: LVDS
  • Operating Supply Voltage: 2 V to 4 V
  • Product Type: Other Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

SN65LVDS387EVM

SN65LVDS387EVM Specifications

SN65LVDS387EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is LVDS Driver/Receiver.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is LVDS.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2 V to 4 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Other Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top