SN55LVCP22EVM-CVAL

Mfr. #: SN55LVCP22EVM-CVAL
निर्माता: Texas Instruments
विवरण: Interface Development Tools SN55LVCP22EVM-CVAL
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: SN55LVCP22EVM-CVAL डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
SN55LVCP22EVM-CVAL Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the I/O Controller type. Texas Instruments is a trusted brand for quality electronics Interface Type: SMA Connectors The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 55 C. 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

SN55LVCP22EVM-CVAL Image

SN55LVCP22EVM-CVAL

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

SN55LVCP22EVM-CVAL Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: I/O Controller
  • Series: SN55LVCP22-SP
  • Brand: Texas Instruments
  • Interface Type: SMA Connectors
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 55 C
  • Operating Supply Voltage: 3.3 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

SN55LVCP22EVM-CVAL

SN55LVCP22EVM-CVAL Specifications

SN55LVCP22EVM-CVAL FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed I/O Controller

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SMA Connectors.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 55 C.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top