PCM5142EVM-U

Mfr. #: PCM5142EVM-U
निर्माता: Texas Instruments
विवरण: Audio IC Development Tools PCM5142 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: PCM5142EVM-U डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM5142EVM-U Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio type. 2 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: 3-Wire Compatible with PCM5142. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 25 C. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PCM5142EVM-U Image

PCM5142EVM-U

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM5142EVM-U Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Audio
  • Tool Is For Evaluation Of: PCM5142
  • Operating Supply Voltage: 2 V
  • Series: PCM5142
  • Brand: Texas Instruments
  • Interface Type: 3-Wire
  • For Use With: PCM5142
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 25 C
  • Operating Supply Current: 32 mA
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PCM5142EVM-U

PCM5142EVM-U Specifications

PCM5142EVM-U FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed 3-Wire

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is PCM5142.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 25 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top