PCM1864EVM

Mfr. #: PCM1864EVM
निर्माता: Texas Instruments
विवरण: Audio IC Development Tools PCM1864EVM-SW Contr Evaluation Module
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: PCM1864EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM1864EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Audio type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with USB-I2X. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PCM1864EVM Image

PCM1864EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM1864EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Audio
  • Tool Is For Evaluation Of: PCM1864
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluation board for the PCM186x family of ADCs
  • Series: PCM1864
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: USB-I2X
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PCM1864EVM

PCM1864EVM Specifications

PCM1864EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is USB-I2X.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top