MRD2EVM

Mfr. #: MRD2EVM
निर्माता: Texas Instruments
विवरण: RFID Transponder Tools Microreader EVAL BRD
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: MRD2EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
MRD2EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits 2.7 V to 5.5 V operating supply voltage range Frequency range: 134.2 kHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, RS232, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RFID Transponder Tools product type 1 of 100 Development Tools as subcategory

MRD2EVM Image

MRD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MRD2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RFID Transponder Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Description/Function: RFID Evaluation Kit
  • Frequency: 134.2 kHz
  • Brand: Texas Instruments
  • Interface Type: SPI, RS232, USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: RFID Transponder Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

MRD2EVM

MRD2EVM Specifications

MRD2EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V to 5.5 V

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 134.2 kHz

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI, RS232, USB.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RFID Transponder Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

21 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top