LP5912DRV33EVM

Mfr. #: LP5912DRV33EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools LP5912DRV33EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: LP5912DRV33EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP5912DRV33EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 3.8 V to 6.5 V Input Voltage Output Voltage is 3.3 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 6.088 lbs of Unit Weight

LP5912DRV33EVM Image

LP5912DRV33EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP5912DRV33EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: LP5912DRV
  • Input Voltage: 3.8 V to 6.5 V
  • Output Voltage: 3.3 V
  • Series: LP5912
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 6.088 lbs

LP5912DRV33EVM

LP5912DRV33EVM Specifications

LP5912DRV33EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 3.8 V to 6.5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 6.088 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top