LM8365EVM

Mfr. #: LM8365EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools LM8365EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: LM8365EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM8365EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Supervisory Circuits type. 1 V to 6 V Input Voltage Dimensions of 1.5 in x 1.15 in Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.740 lbs of Unit Weight

LM8365EVM Image

LM8365EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM8365EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Supervisory Circuits
  • Tool Is For Evaluation Of: LM8365
  • Input Voltage: 1 V to 6 V
  • Description/Function: Micropower undervoltage supervisor evaluation module
  • Dimensions: 1.5 in x 1.15 in
  • Series: LM8365
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1.740 lbs

LM8365EVM

LM8365EVM Specifications

LM8365EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Supervisory Circuits

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 1 V to 6 V

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 1.5 in x 1.15 in

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 1.740 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top