ISO7310C-EVM

Mfr. #: ISO7310C-EVM
निर्माता: Texas Instruments
विवरण: Interface Development Tools SO7310C-EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ISO7310C-EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ISO7310C-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Digital Isolator type. Texas Instruments is a trusted brand for quality electronics Compatible with ISO7310C. 5.5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

ISO7310C-EVM Image

ISO7310C-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ISO7310C-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Digital Isolator
  • Tool Is For Evaluation Of: ISO7310C
  • Description/Function: Evaluates device performance, supporting the fast development and analysis of isolated systems
  • Series: ISO7310C
  • Brand: Texas Instruments
  • For Use With: ISO7310C
  • Operating Supply Voltage: 5.5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ISO7310C-EVM

ISO7310C-EVM Specifications

ISO7310C-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Digital Isolator.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ISO7310C.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5.5 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top