HDC1080EVM

Mfr. #: HDC1080EVM
निर्माता: Texas Instruments
विवरण: Temperature Sensor Development Tools HDC1080EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: HDC1080EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
HDC1080EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Humidity, Temperature Sensor type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.010321 oz of Unit Weight

HDC1080EVM Image

HDC1080EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

HDC1080EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Humidity, Temperature Sensor
  • Tool Is For Evaluation Of: HDC1080
  • Operating Supply Voltage: 3.3 V
  • Series: HDC1080
  • Brand: Texas Instruments
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.010321 oz

HDC1080EVM

HDC1080EVM Specifications

HDC1080EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Humidity, Temperature Sensor.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Temperature Sensor Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.010321 oz

13 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top