| Mfr. #: | FRDM-HB2000-EVM |
|---|---|
| निर्माता: | NXP Semiconductors |
| विवरण: | Power Management IC Development Tools Freedom Expansion Board- HB2000, 10 A H-B, RDSon 235mOhm max, Programmable Brushed DC Motor Driver |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | FRDM-HB2000-EVM डाटा पाना |


This product is manufactured by NXP. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 5 V to 40 V Input Voltage NXP Semiconductors is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory This product is also known by the 935326276598 number of 934069005115. 1. 1 lb of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FRDM-HB2000-EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed NXP
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Motor / Motion Controllers & Drivers.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 5 V to 40 V.
A: What is the Brand of the product?
Q: The Brand of the product is NXP Semiconductors.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Part # Aliases?
Q: The product Part # Aliases is 935326276598.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 1 lb