DRV8886EVM

Mfr. #: DRV8886EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools DRV8886EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DRV8886EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8886EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 8 V to 37 V Input Voltage Output Voltage is 3.3 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8886EVM Image

DRV8886EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8886EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8886
  • Input Voltage: 8 V to 37 V
  • Output Voltage: 3.3 V
  • Description/Function: Evaluation module for DRV8886 stepper motor driver
  • Output Current: 2 A
  • Series: DRV8886
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8886EVM

DRV8886EVM Specifications

DRV8886EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 8 V to 37 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top