| Mfr. #: | DRV8880EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Power Management IC Development Tools DRV8880EVM |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | DRV8880EVM डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 6.5 V to 45 V Input Voltage Bulk packaging for easy dispensing Output current: 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8880EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Motor / Motion Controllers & Drivers.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 6.5 V to 45 V.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: At what frequency does the Output Current?
Q: The product Output Current is 2 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.