| Mfr. #: | DRV8844EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Power Management IC Development Tools DRV8844 Eval Mod |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | DRV8844EVM डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 8 V to 60 V Input Voltage Output current: 3.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with DRV8844. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8844EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Power Management Specialized.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 8 V to 60 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 3.5 A
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed DRV8844
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.