DRV8703-Q1EVM

Mfr. #: DRV8703-Q1EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools DRV8703-Q1EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DRV8703-Q1EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8703-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Gate Drivers type. 5.9 V to 45 V Input Voltage The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Interface Type: UART, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8703-Q1EVM Image

DRV8703-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8703-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Gate Drivers
  • Tool Is For Evaluation Of: DRV8703-Q1
  • Input Voltage: 5.9 V to 45 V
  • Qualification: AEC-Q100
  • Description/Function: Evaluates the DRV8703-Q1 H-bridge gate driver
  • Series: DRV8703-Q1
  • Brand: Texas Instruments
  • Interface Type: UART, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8703-Q1EVM

DRV8703-Q1EVM Specifications

DRV8703-Q1EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Gate Drivers

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 5.9 V to 45 V

  • A: What is the Qualification of the product?

    Q: The Qualification of the product is AEC-Q100.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed UART, USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top