DRV632EVM

Mfr. #: DRV632EVM
निर्माता: Texas Instruments
विवरण: Audio IC Development Tools DRV632EVM Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DRV632EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV632EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 8.818490 oz of Unit Weight

DRV632EVM Image

DRV632EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV632EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: DRV632
  • Operating Supply Voltage: 3.3 V
  • Series: DRV632
  • Brand: Texas Instruments
  • Operating Supply Current: 25 mA
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 8.818490 oz

DRV632EVM

DRV632EVM Specifications

DRV632EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 8.818490 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top