| Mfr. #: | DRV-ACC16-EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Acceleration Sensor Development Tools DRV-ACC16-EVM |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | DRV-ACC16-EVM डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the Accelerometer Sensor type. 3.5 V to 5.5 V operating supply voltage range Dimensions of 290 mm x 15 mm Acceleration of 16 g force Texas Instruments is a trusted brand for quality electronics Interface Type: Analog Three sensing axes: Triple Axis The product can operate at a maximum temperature of + 70 C. The minimum operating temperature of this product is - 25 C. Acceleration Sensor Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV-ACC16-EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Kits
A: What is the Type of the product?
Q: The Type of the product is Accelerometer Sensor.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 3.5 V to 5.5 V.
A: At what frequency does the Dimensions?
Q: The product Dimensions is 290 mm x 15 mm.
A: At what frequency does the Acceleration?
Q: The product Acceleration is 16 g.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is Analog.
A: At what frequency does the Sensing Axis?
Q: The product Sensing Axis is Triple Axis.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 70 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 25 C
A: What is the Product Type of the product?
Q: The Product Type of the product is Acceleration Sensor Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools