DAC70508EVM

Mfr. #: DAC70508EVM
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools DAC80508EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DAC70508EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC70508EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 2.7 V to 5.5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC70508EVM Image

DAC70508EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC70508EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC70508EVM
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Voltage Output DAC with Internal Reference
  • Series: DAC70508
  • Brand: Texas Instruments
  • Interface Type: SPI
  • Operating Supply Current: 20 mA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC70508EVM

DAC70508EVM Specifications

DAC70508EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.7 V to 5.5 V.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top