DAC5662EVM

Mfr. #: DAC5662EVM
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools EVM - 12 bit 200 MSPS Dual DAC
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: DAC5662EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5662EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SMA Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC5662EVM Image

DAC5662EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5662EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC5662
  • Series: DAC5662
  • Brand: Texas Instruments
  • Interface Type: I2C, SMA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC5662EVM

DAC5662EVM Specifications

DAC5662EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, SMA.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top