CDCM9102EVM

Mfr. #: CDCM9102EVM
निर्माता: Texas Instruments
विवरण: Clock & Timer Development Tools CDCM9102 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: CDCM9102EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCM9102EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Generators type. Frequency range: 100 MHz Texas Instruments is a trusted brand for quality electronics 3 V to 3.6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory 1. 1 oz of Unit Weight

CDCM9102EVM Image

CDCM9102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCM9102EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Clock Generators
  • Tool Is For Evaluation Of: CDCM9102
  • Frequency: 100 MHz
  • Series: CDCM9102
  • Brand: Texas Instruments
  • Operating Supply Voltage: 3 V to 3.6 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1 oz

CDCM9102EVM

CDCM9102EVM Specifications

CDCM9102EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Generators

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 100 MHz

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3 V to 3.6 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Clock & Timer Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 1 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top