| Mfr. #: | BQ76930EVM |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Power Management IC Development Tools Evaluation Module |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | BQ76930EVM डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 26 V to 44 V Input Voltage Output Voltage is 2.5 V Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with EV2300, EV2400. The product can operate at a maximum temperature of + 30 C. The minimum operating temperature of this product is + 20 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.231710 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76930EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Battery Management.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 26 V to 44 V
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 2.5 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 15 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is USB.
A: At what frequency does the For Use With?
Q: The product For Use With is EV2300, EV2400.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 30 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is + 20 C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.231710 oz.