BQ25892EVM-664

Mfr. #: BQ25892EVM-664
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools BQ25892 Eval Module
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: BQ25892EVM-664 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ25892EVM-664 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 3.9 V to 14 V Input Voltage Output Voltage is 4.5 V to 5.5 V Output current: 2.4 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.087431 oz of Unit Weight

BQ25892EVM-664 Image

BQ25892EVM-664

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ25892EVM-664 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ25892
  • Input Voltage: 3.9 V to 14 V
  • Output Voltage: 4.5 V to 5.5 V
  • Description/Function: Complete charger evaluation module for BQ25892
  • Output Current: 2.4 A
  • Series: BQ25892
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.087431 oz

BQ25892EVM-664

BQ25892EVM-664 Specifications

BQ25892EVM-664 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.9 V to 14 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 4.5 V to 5.5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2.4 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.087431 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top