BQ25710EVM-017

Mfr. #: BQ25710EVM-017
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools BQ25710EVM-732
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: BQ25710EVM-017 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ25710EVM-017 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 3.5 V to 24 V Input Voltage Output Voltage is 19.2 V Output current: 8 A Texas Instruments is a trusted brand for quality electronics Compatible with BQ2571x. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ25710EVM-017 Image

BQ25710EVM-017

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ25710EVM-017 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: BQ2571x
  • Input Voltage: 3.5 V to 24 V
  • Output Voltage: 19.2 V
  • Description/Function: BQ2571x evaluation module
  • Output Current: 8 A
  • Series: BQ25710
  • Brand: Texas Instruments
  • For Use With: BQ2571x
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: 0 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ25710EVM-017

BQ25710EVM-017 Specifications

BQ25710EVM-017 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Power Distributions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.5 V to 24 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 19.2 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 8 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed BQ2571x

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed 0 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

13 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top