| Mfr. #: | BQ24770EVM-540 |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Power Management IC Development Tools BQ24770EVM-540 |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | BQ24770EVM-540 डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Charge Pumps type. 19 V Input Voltage Output Voltage is - Output current: 8 A Texas Instruments is a trusted brand for quality electronics Compatible with BQ2477x. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.184021 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24770EVM-540 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Charge Pumps.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 19 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is -.
A: At what frequency does the Output Current?
Q: The product Output Current is 8 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the For Use With of the product?
Q: The For Use With of the product is BQ2477x.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 125 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed 0 C
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.184021 oz