| Mfr. #: | BQ24266EVM-609 |
|---|---|
| निर्माता: | Texas Instruments |
| विवरण: | Power Management IC Development Tools 3A, 30V, Sng input Sngl Cell Batt Charg |
| जीवन चक्र: | यस निर्माताबाट नयाँ। |
| डाटा पाना: | BQ24266EVM-609 डाटा पाना |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 4.2 V to 14 V Input Voltage Output Voltage is 4.2 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.245459 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24266EVM-609 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Battery Management.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 4.2 V to 14 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 4.2 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 3 A
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.245459 oz