BQ24251EVM-150

Mfr. #: BQ24251EVM-150
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools BQ24251 EVAL MOD
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: BQ24251EVM-150 डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24251EVM-150 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 4.35 V to 10.5 V Input Voltage Output Voltage is 4.2 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with bq24251. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24251EVM-150 Image

BQ24251EVM-150

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24251EVM-150 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: bq24251
  • Input Voltage: 4.35 V to 10.5 V
  • Output Voltage: 4.2 V
  • Description/Function: Evaluation Module for the bq24251
  • Output Current: 2 A
  • Series: BQ24251
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: bq24251
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24251EVM-150

BQ24251EVM-150 Specifications

BQ24251EVM-150 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4.35 V to 10.5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 4.2 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is bq24251.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top