BQ24092EVM

Mfr. #: BQ24092EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools BQ24092 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: BQ24092EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24092EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 4.45 V to 6.45 V Input Voltage Output Voltage is 4.2 V Output current: 540 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24092EVM Image

BQ24092EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24092EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24092
  • Input Voltage: 4.45 V to 6.45 V
  • Output Voltage: 4.2 V
  • Description/Function: BQ24092 single input, single cell Li-Ion battery charger
  • Output Current: 540 mA
  • Series: BQ24092
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24092EVM

BQ24092EVM Specifications

BQ24092EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4.45 V to 6.45 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 4.2 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 540 mA.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top