BQ24090EVM

Mfr. #: BQ24090EVM
निर्माता: Texas Instruments
विवरण: Power Management IC Development Tools BQ24090 Eval Mod
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: BQ24090EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24090EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 4.45 V to 6.45 V Input Voltage Output Voltage is 4.2 V Output current: 540 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24090EVM Image

BQ24090EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24090EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24090
  • Input Voltage: 4.45 V to 6.45 V
  • Output Voltage: 4.2 V
  • Description/Function: BQ24090 single input, single cell Li-Ion and Li-Pol linear battery charger
  • Output Current: 540 mA
  • Series: BQ24090
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24090EVM

BQ24090EVM Specifications

BQ24090EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4.45 V to 6.45 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 4.2 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 540 mA

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top