AMC1304M05EVM

Mfr. #: AMC1304M05EVM
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools AMC1304M05EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: AMC1304M05EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1304M05EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Data Acquisitions type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: CMOS Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

AMC1304M05EVM Image

AMC1304M05EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1304M05EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Data Acquisitions
  • Tool Is For Evaluation Of: AMC1304M05
  • Packaging: Bulk
  • Description/Function: Reinforced isolated modulator evaluation module
  • Series: AMC1304M05
  • Brand: Texas Instruments
  • Interface Type: CMOS
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AMC1304M05EVM

AMC1304M05EVM Specifications

AMC1304M05EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Data Acquisitions.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is CMOS.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top