AFE7070EVM

Mfr. #: AFE7070EVM
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools AFE7070 Evaluation Module
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: AFE7070EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE7070EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the DAC type. 1 V to 2.6 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Compatible with AFE7070. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

AFE7070EVM Image

AFE7070EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE7070EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: DAC
  • Tool Is For Evaluation Of: AFE7070
  • Operating Supply Voltage: 1 V to 2.6 V
  • Description/Function: Evaluation module for the AFE7070 digital to analog converter
  • Series: AFE7070
  • Brand: Texas Instruments
  • Interface Type: SPI
  • For Use With: AFE7070
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AFE7070EVM

AFE7070EVM Specifications

AFE7070EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1 V to 2.6 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SPI

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed AFE7070

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 85 C

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top