ADS9110EVM-PDK

Mfr. #: ADS9110EVM-PDK
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools ADS9110EVM-PDK
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS9110EVM-PDK डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS9110EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS9110EVM-PDK Image

ADS9110EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS9110EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: ADS9110
  • Operating Supply Voltage: 3.3 V
  • Description/Function: Evaluation board for the ADS9110 SAR ADC
  • Series: ADS9110
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS9110EVM-PDK

ADS9110EVM-PDK Specifications

ADS9110EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Demonstration Kits.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, SPI, USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top