ADS8688EVM-PDK

Mfr. #: ADS8688EVM-PDK
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools ADS8688 Perf Dem Kit
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS8688EVM-PDK डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8688EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Boards This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Compatible with ADS8688. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8688EVM-PDK Image

ADS8688EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8688EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS8688
  • Operating Supply Voltage: 5 V
  • Description/Function: Demonstration board for 8-channel 16-bit, 500 ksps ADC
  • Series: ADS8688
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • For Use With: ADS8688
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8688EVM-PDK

ADS8688EVM-PDK Specifications

ADS8688EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Demonstration Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI, USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is ADS8688.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top