ADS5295EVM

Mfr. #: ADS5295EVM
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools ADS5295 EVAL MOD
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS5295EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5295EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 1.65 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with ADS5295. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.083205 oz of Unit Weight

ADS5295EVM Image

ADS5295EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5295EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS5295
  • Operating Supply Voltage: 1.65 V
  • Series: ADS5295
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: ADS5295
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.083205 oz

ADS5295EVM

ADS5295EVM Specifications

ADS5295EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.65 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed ADS5295

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.083205 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top