ADS1246EVM-PDK

Mfr. #: ADS1246EVM-PDK
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools ADS1246 Perf Dev Kit
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADS1246EVM-PDK डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1246EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 2.5 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS1246EVM-PDK Image

ADS1246EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1246EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS1246
  • Operating Supply Voltage: 2.5 V to 5 V
  • Series: ADS1246
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS1246EVM-PDK

ADS1246EVM-PDK Specifications

ADS1246EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.5 V to 5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top