ADC3244EVM

Mfr. #: ADC3244EVM
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools ADC3244 Eval Module
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADC3244EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3244EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 1.8 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Compatible with ADC3244. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.138035 oz of Unit Weight

ADC3244EVM Image

ADC3244EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3244EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC3244
  • Operating Supply Voltage: 1.8 V
  • Series: ADC3423
  • Brand: Texas Instruments
  • Interface Type: Serial
  • For Use With: ADC3244
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.138035 oz

ADC3244EVM

ADC3244EVM Specifications

ADC3244EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.8 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Serial.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ADC3244.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.138035 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top