ADC3241EVM

Mfr. #: ADC3241EVM
निर्माता: Texas Instruments
विवरण: Data Conversion IC Development Tools ADC3241EVM
जीवन चक्र: यस निर्माताबाट नयाँ।
डाटा पाना: ADC3241EVM डाटा पाना
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3241EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 1.8 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: Serial LVDS Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADC3241EVM Image

ADC3241EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3241EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC3241
  • Operating Supply Voltage: 1.8 V
  • Packaging: Bulk
  • Description/Function: ADC3241 evaluation module
  • Series: ADC3423
  • Brand: Texas Instruments
  • Interface Type: Serial LVDS
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADC3241EVM

ADC3241EVM Specifications

ADC3241EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is Serial LVDS.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
मात्रा
एकाइ मूल्य
विस्तार मूल्य
Top